Deprecated: Methods with the same name as their class will not be constructors in a future version of PHP; qa_layer_9_from_layer_php has a deprecated constructor in /home/abouaayt/public_html/aboutcivil/answers/qa-include/qa-base.php(720) : eval()'d code on line 3
of /home/abouaayt/public_html/aboutcivil/answers/qa-plugin/user-management/layer.php what are the factors considering in site selection - Civil Engineering Technical Questions Answers - Ask a Civil Engineer
  • Register
0 votes
what are the factors considering in site selection
in Civil Engineering by  

1 Answer

0 votes
Summary of factors affecting site selection

The most important factors community groups and families should consider in choosing a site for their building are:

    • whether the soil will support the weight of the building;
    • whether the site is drained well-enough to prevent water damage;
    • whether the site is large enough to accommodate their immediate and future needs;
    • whether the site is easily accessible for construction and use of the building;
    • whether the site is comfortable, safe, and healthful.

In most cases, builders have to compromise between these concerns. Choosing the best site among several less-than-ideal possibilities is often difficult and complex. It is always best to get experienced advice, whenever there is any doubt. Contractors, engineers, or architects in the area can help make the options clear, especially in terms of cost and labor.

One Final Caution. In many areas, local regulations will influence what can be built, where it can be built, and how it can be built. Building and zoning codes, permits, licenses, and accepted practices vary widely from country to country and locality to locality. To avoid wasted or illegal effort, the field worker should help family or community members learn their restrictions and obligations during the basic planning and design process. This should always be done before settling on a definite site for construction.
by  

Related questions

0 votes
0 answers 240 views
0 votes
0 answers 592 views
592 views asked Jul 1, 2015 in Airport Engineering by mfby2k  

    Warning: count(): Parameter must be an array or an object that implements Countable in /home/abouaayt/public_html/aboutcivil/answers/qa-include/qa-base.php(720) : eval()'d code on line 12
  • engineering

  • Warning: count(): Parameter must be an array or an object that implements Countable in /home/abouaayt/public_html/aboutcivil/answers/qa-include/qa-base.php(720) : eval()'d code on line 12
  • civil

  • Warning: count(): Parameter must be an array or an object that implements Countable in /home/abouaayt/public_html/aboutcivil/answers/qa-include/qa-base.php(720) : eval()'d code on line 12
  • airport
0 votes
0 answers 386 views
386 views asked Jul 2, 2015 in Foundation Engineering by mfby2k  

    Warning: count(): Parameter must be an array or an object that implements Countable in /home/abouaayt/public_html/aboutcivil/answers/qa-include/qa-base.php(720) : eval()'d code on line 12
  • foundation

  • Warning: count(): Parameter must be an array or an object that implements Countable in /home/abouaayt/public_html/aboutcivil/answers/qa-include/qa-base.php(720) : eval()'d code on line 12
  • geotechnical

  • Warning: count(): Parameter must be an array or an object that implements Countable in /home/abouaayt/public_html/aboutcivil/answers/qa-include/qa-base.php(720) : eval()'d code on line 12
  • engineering
0 votes
1 answer 828 views
828 views asked Aug 20, 2015 in Bridge Engineering by mfby2k  

    Warning: count(): Parameter must be an array or an object that implements Countable in /home/abouaayt/public_html/aboutcivil/answers/qa-include/qa-base.php(720) : eval()'d code on line 12
  • civil
0 votes
0 answers 294 views
294 views asked Aug 20, 2015 in Surveying & Levelling by mfby2k  

    Warning: count(): Parameter must be an array or an object that implements Countable in /home/abouaayt/public_html/aboutcivil/answers/qa-include/qa-base.php(720) : eval()'d code on line 12
  • civil
...