Types of Concrete Joints in Buildings and their Characteristics

By: Haseeb Jamal / On: Jan 22, 2017 / Types of
Construction Joints
 
 

Expansion Joints

These are structural separation between building elements that allow independent movement without damage to the assembly. An expansion joint is used in concrete and steel. An expansion joint allows the concrete or steel to expand or contract with daily temperature variations. If you don’t allow this, you may get buckling, or spalling, or total failures. They are commonly provided in bridges, railway tracks, piping systems, and other structures.

Expansion Joints

Contraction Joints or Control Joints

Control Joints in Building StructuresA control joint or contraction joint is a joint that is put in the concrete to control cracking. Control Joints (often confused with expansion joints) are cuts or grooves made in concrete or asphalt at regular intervals. These joints are made at locations where there are chances of cracks or where the concentration of stresses are expected, so that when a concrete does crack, the location will be known to you. In such a way concrete will not crack randomly but in a straight line (i.e. control joint). In other words Contraction or Control Joints are Pre-Planned Cracks. The cracks may be due to temperature variations or drying shrinkage or other reasons.

Joints depth should be 25% of the depth of the slab. For instance a 4" thick slab should have 1" deep cut. Joints Interval (taken in feet) should not be more than 2 - 3 times the slab thickness (in inches). Let say a 6" slab should have joints 2 x 6=12 to 3 x 6 = 18 feet apart. For fresh concrete grooving tools are used while saw is used for hardened concrete.

Construction Joints

Construction JointsA construction joint occurs when there are multiple concrete placements. It can occur between different days of concrete placements.

In mega projects there are starting and stopping points. The entire concrete work may not be done at once, hence concrete pouring needs to be stopped causing a joint in element known as Construction Joint. Construction joints are placed at points of ending and beginning of construction for provision of a smooth transition between pours. These joints are formed between successive building element parts during construction work, in which one part is allowed to harden before the next is placed. These joints may be intentional or unintentional. Reasons for intentionally providing construction joints are;

  • Certain time of a day i.e. Labour Hours ( e.g. 8:00 am to 6:00 pm)
  • Certain day of a week (e.g. Sunday, or Friday)
  • Certain Months of an year (e.g. extreme weather in Winter or Summer)
  • Religious Holidays etc (e.g. Eid or Christmas etc)

Unintentional provision may occur due to

  • Unexpected shortage of material
  • Equipment Failure
  • Bad weather
 