Procedure for Concrete Sample Preparation
Concrete is placed in the molds using a trowel in three layers of approximately equal depth and is remixed in the mixing pan with a shovel to prevent segregation during the molding of specimens. The trowel is moved around the top edge of the mold as the concrete is discharged in order to ensure a symmetrical distribution of the concrete and to minimize