Selection of Site for Cross Drainage Works
The factors which affect the selection of suitable type of cross drainage works are: 1. Relative bed levels and water levels of canal and drainage. 2. Size of the canal and drainage. 3. When the bed level of the canal is much above the HFL of the drainage, an aqueduct is the obvious choice. 4. When the bed level of the drain is well above FSL of canal, super passage is provided